Make an enquiry

Quantities & estimating

Drawing-based quantities, bills of quantities and optional cost estimates.

Enquire about this service

Request quantities alone, or an estimate that incorporates agreed material, labour, plant, subcontractor and preliminary allowances. Your quote sets out the measurement and pricing basis, assumptions, exclusions and outputs.

When it helps

  • A package needs measuring for pricing or a tender
  • Procurement needs a material schedule
  • Drawings have been revised and quantities need comparing
  • Quantities need reconciling against a BOQ or schedule

What we prepare

Available as a new measure, or as a comparison or reconciliation against what you already have.

  • Drawing-based quantity take-offsQuantities measured from your current drawings.
    Enquire
  • Bills of quantities (BOQs)Quantities set out in a structured, itemised bill.
    Enquire
  • Material schedulesMaterials listed for ordering and procurement.
    Enquire
  • Quantity comparisons between drawing revisionsWhat changed between one drawing revision and the next.
    Enquire
  • Reconciliation against BOQs or supplied schedulesMeasured quantities checked against an existing BOQ or schedule.
    Enquire
  • Measurement mark-upsMarked-up drawings showing what was measured.
    Enquire
  • Cost estimating (optional)Quantities priced using agreed rates and allowances for materials, labour, plant, subcontractors and preliminaries.
    Enquire

What you receive

  • Schedules in the agreed format, with drawing revisions and assumptions recorded
  • Measurement mark-ups, where agreed
  • An estimate summary, where estimating is included

Your quote confirms the file formats, editable files and included review rounds.

What we need from you

  • Current drawings and the revisions to use
  • The work package and scope boundaries
  • The measurement basis and schedule format required
  • Rates and allowances to apply, for estimates

Scope and responsibility

Quantities are measured from the information supplied. Estimates rest on the agreed rates, allowances and assumptions, and are not a guaranteed cost.